A manufacturing RFQ is won or lost on the first call, usually before anyone has priced a single part. The questions that matter cover the part and its drawing, quantity and annual volume, material and tolerances, delivery date and location, who decides and how, whether the requirement is live or a price check, and a dated next step. Get those answers and your estimator can quote properly. Miss them and the quote goes out late, vague, or both.
What follows is the list we would hand a new salesperson at a fabrication shop, a moulding unit, a machining job shop or a contract manufacturer, along with the routine that keeps the enquiry warm after the call ends.
Why RFQs go cold in a different way
A consumer lead goes cold because nobody calls back. An RFQ goes cold for a slower reason. The salesperson calls, has a pleasant chat, says "please send the drawing", and then waits. The buyer's engineer forgets. Your estimator is busy with a running order. A week later the buyer has three quotes from competitors and yours is not one of them.
The fix is not calling more often. It is collecting enough on the first call that your side can move without waiting on the buyer, and agreeing a specific next step before you hang up.
The questions, grouped by what they unlock
The part itself
- Can you share the drawing, and which revision is it? A quote against an old revision is worse than no quote.
- What material and grade, and is there an approved alternative? Many buyers will accept a substitute if you ask. Few will offer one.
- Which dimensions or tolerances are critical? This tells the estimator where the cost sits.
- What finish, coating or heat treatment is needed, and who does it today?
- Is this a new part or one you already buy? If they already buy it, ask what is wrong with the current supplier. The answer is often the whole sale.
Quantity and commercial terms
- How many for this order, and what is the expected annual volume? A one-off batch and a recurring monthly schedule need different pricing and different attention.
- Is there a target price? Some buyers will tell you. If they won't, ask what they paid last time.
- Who supplies the raw material, you or us?
- Do you need tooling, fixtures or a sample first, and who pays for those?
- What payment terms does your company usually work on? Better to hear this now than after the quote is accepted.
Timeline and logistics
- When do you need the first delivery, and what is driving that date? A date tied to a customer launch is real. A date someone picked is negotiable.
- Where is it to be delivered, and who arranges transport?
- How should it be packed? Export packing, returnable bins and bulk boxes all cost different amounts.
The buying process
This is the group salespeople skip, and it is the one that decides whether the quote matters at all.
- Who else is involved in choosing the supplier? Purchase, quality, the plant head, the owner.
- How many suppliers are you asking to quote?
- When do you plan to decide?
- Will you need a vendor registration, a quality audit or sample approval before a first order?
- What would make you change suppliers, if you have one today?
Telling a live requirement from a price check
Every manufacturing sales team gets RFQs that are really benchmarking. The buyer has a supplier and wants a number to push them down with. You cannot always avoid these, but you can stop spending your estimator's time on them first.
| Signal | Likely live | Likely a price check |
|---|---|---|
| Drawing | Current revision, sent quickly | "Will send later", or an old print |
| Volume | Clear quantity and schedule | Vague, "depends on price" |
| Date | Tied to a project or customer | No date, or "as soon as possible" |
| Process | Names the people who decide | Cannot say who decides |
| Current supplier | Specific complaint | "Just comparing" |
None of these is proof. Two or three answers in the right-hand column mean you should quote, but quote after the live enquiries in the queue.
What not to do on the first call
Do not give a price on the phone. Even a range gets written down and held against you once the estimator finds the tolerance that doubles machining time.
Do not promise a lead time until production has seen the drawing and checked the current load.
Do not end the call with "send me the details". End it with "I'll send a list of what I need by this evening. Can your engineer send the drawing by Thursday, and shall I call you Friday at eleven to confirm we have everything?" A next step with a day and a time is a commitment. "Let's stay in touch" is not.
The routine after the call
A good first call is wasted if the answers stay in the salesperson's notebook. Here is a routine a team of five or fifty can run every time.
- Log the answers the same day against the lead, using the same headings each time so the estimator knows where to look.
- Send the buyer a short written summary of what you understood: part, quantity, material, delivery date. Mistakes surface here, before you have priced anything.
- Hand over to estimation with a quote due date the salesperson has agreed internally.
- Set the next follow-up for the date agreed on the call, not "sometime next week".
- Send the quotation with GST and HSN codes correct on the first version, so purchase does not bounce it back for a revision.
- Call within a day or two of sending the quote to check it reached the right person and to ask what happens next.
- Record why it was won or lost. After a few months this tells you which part types, buyer sizes and enquiry sources are worth chasing.
Managers should look at one thing each week: RFQs with no next step, or with a next step that has passed. Those are the enquiries going cold.
Where a CRM helps, and where it doesn't
No software asks the right questions for your salesperson. That comes from training and from the list above. What a CRM can do is make sure enquiries reach someone quickly and the follow-up never depends on memory.
In CustomerBond, enquiries from website forms, WhatsApp, Google and Facebook ads, file imports or the API land on one record per buyer, even if the same purchase manager enquires three times. Lead distribution rules can send sheet-metal enquiries to one salesperson and machined parts to another, and escalate if nobody picks a lead up. Call logging and follow-ups record calls from the salesperson's Android phone, ask for an outcome after each one, require a next step on every lead, and show managers what is overdue. Quotations go out with GST and HSN codes and the buyer can accept them online.
If that matches how your team works, plans are on the pricing page, and you can book a demo to see it with your own enquiry types.
Frequently Asked Questions
What is the single most important question on a first RFQ call?
Ask for the expected annual volume as well as the first order quantity. It decides how you price, how much attention the account deserves and whether tooling costs can be spread out. Buyers rarely volunteer it unless asked.
Should a salesperson give a rough price on the first call?
No. Any number spoken on the call tends to become the buyer's anchor, even if the drawing later shows a costly tolerance or finish. Agree a date by which a proper quotation will be sent.
How soon should we follow up after sending a quotation?
Within a day or two, at a time you agreed with the buyer when you sent it. The first follow-up is to confirm the quote reached the decision makers and to learn the next step. Leaving it a week invites the buyer to settle on whoever called back first.
How do we stop wasting estimation time on price-check RFQs?
Use the first call to check for a current drawing, a clear volume, a real delivery date and named decision makers. Enquiries missing several of these can still be quoted, but after the live ones. Over time, track win rates by enquiry type to sharpen the judgement.
Who should own an RFQ once the estimator is involved?
The salesperson should stay the owner from first call to decision. The estimator prepares the numbers, but the salesperson holds the buyer relationship and the follow-up dates. Splitting ownership is how enquiries fall between two desks.